222 MAIN OFFICE BUILDING
Salt Lake City, UT
Constructing a Seismically Advanced High-Rise Within a Zero-Access Urban Footprint
The 222 Main Office Building was awarded the 2010 Gold Best of Awards Outstanding Office Project by Mountain States Construction magazine. This twenty-two story building required 4,500 tons of structural steel and supports more than 350,000 square feet of office space. The project begins with footings and concrete mat slabs ranging from three feet to seven feet deep. SME Steel Contractors provided the structural steel as well as anchor bolt frames that penetrated the entire depth of the concrete mat slabs to create unflinching stability. Two seismic systems were utilized. For the perimeter, bolted moment frames with reduced beam (dog bone) sections were used. For the interior core, CoreBrace™ buckling restrained brace frames were chosen. Complicating matters, there was no land access to the site, causing the steel to be erected inside the footprint of the building. The floors were loaded and erected from below. The pinnacle achievement comes from constructing the first LEED-certified high rise building from the ground up in Salt Lake City, Utah.
Project Details
12/01/2010
4,500 tons of steel
CLIENT
Hamilton Partners
CONTRACTOR
Okland Construction
ARCHITECT
MHTN Architects Inc.
STRUCTURAL ENGINEER
Great Basin Engineering
CONSULTING ENGINEER
Environmental Systems Design Inc.
Related Projects
111 Main
111 Main Office Tower Salt Lake City, Utah Engineering a Suspended High-Rise Through Cantilevers and a Structural Hat Truss 111 Main Office Tower is a 26-story high rise and an engineering marvel. The unique structure begins with temporary steel on level one and the first main floor
Workers Compensation Fund Office
Workers Compensation Fund Office Building Be Careful Out There. Harnessing Advanced Seismic Steel Systems for an Award-Winning Office Landmark The Workers Compensation Fund Office Building was awarded the 2010 Bronze Best of Awards Outstanding Office Project by Mountain States Construction maga-zine. SME Steel Contractors fabricated and erected
(W)rapper Tower
(W)rapper Tower Los Angeles, California Exoskeletal Steel Bands Creating a Column-Free, Seismically Resilient High-Rise Rising 245 feet above grade, impressive steel bands create the exoskeleton for the (W)rapper Tower: an unconventional, 17-story, office tower that has zero interior columns, leaving the floors entirely open. This unique building
NVIDIA Triangle
NVIDIA Triangle Santa Clara, California NVIDIA Triangle Santa Clara, CA Structural Steel Shaping a People-Centered, Polygon-Inspired Innovation Hub The unique and creative design for the NVIDIA Triangle is built to reflect NVIDIA’s core value of people as its greatest asset. Oversized platforms replace