222 MAIN OFFICE BUILDING
Salt Lake City, UT
Constructing a Seismically Advanced High-Rise Within a Zero-Access Urban Footprint
The 222 Main Office Building was awarded the 2010 Gold Best of Awards Outstanding Office Project by Mountain States Construction magazine. This twenty-two story building required 4,500 tons of structural steel and supports more than 350,000 square feet of office space. The project begins with footings and concrete mat slabs ranging from three feet to seven feet deep. SME Steel Contractors provided the structural steel as well as anchor bolt frames that penetrated the entire depth of the concrete mat slabs to create unflinching stability. Two seismic systems were utilized. For the perimeter, bolted moment frames with reduced beam (dog bone) sections were used. For the interior core, CoreBrace™ buckling restrained brace frames were chosen. Complicating matters, there was no land access to the site, causing the steel to be erected inside the footprint of the building. The floors were loaded and erected from below. The pinnacle achievement comes from constructing the first LEED-certified high rise building from the ground up in Salt Lake City, Utah.
Project Details
12/01/2010
4,500 tons of steel
CLIENT
Hamilton Partners
CONTRACTOR
Okland Construction
ARCHITECT
MHTN Architects Inc.
STRUCTURAL ENGINEER
Great Basin Engineering
CONSULTING ENGINEER
Environmental Systems Design Inc.
Related Projects
Salt Palace Convention Center
Salt Palace Convention Center Salt Lake City, Utah Long-Span AESS Trusses and Sculptural Steel Defining a Landmark Convention Hall The Salt Palace Convention Center was skillfully erected utilizing two cranes simultaneously. Flawless AESS banana trusses support the unique roof structure of the perimeter while 260 ft triangulated
Wallis Annenberg Center
Wallis Annenberg Center Beverly Hills, California Blending Historic Preservation and Contemporary Performance Architecture Through Structural Steel Building the Wallis Annenberg Center for the Performing Arts in the heart of Beverly Hills involved the creation of a new cultural facility that both preserves and adapts the landmark 1933
Zions Bank
Zions Bank Provo, Utah Executing a Seismically Resilient Financial Center on a Constrained Urban Site Zions Bank Financial Center is a structure with varying tower heights advancing to nine stories at its highest point. This project required tight scheduling to accommodate erection between two existing buildings and
Moscone Center Expansion
Moscone Center Expansion San Francisco, California Delivering a Phased, Below-Grade Expansion While Keeping a Convention Center Fully Operational The Moscone Center Expansion project is an extraordinary effort by the City of San Francisco and the entire design and construction team. SME played a vital role in a
Horton Plaza
Horton Plaza San Diego, California Transforming a Retail Landmark into a Next-Generation Urban Tech Campus Redevelopment of Horton Plaza from shopping mall to office/tech campus is multi-phase project with the first phase of demolition of the exterior façade. The future Campus at Horton will include 700,000 square
Dendreon Pharmaceuticals
Dendreon Pharmaceuticals Seal Beach, California Structural Steel Supporting Precision Pharmaceutical Production Dendreon Pharmaceuticals is a state-of-the-art facility dedicated to biopharmaceuticals and the development of immunotherapy for cancer treatments utilizing the patient’s own immune cells. Building Systems include clean rooms, manufacturing practices space, laboratories, administrative space, warehousing, modular
Albright Campus
Albright Campus Los Gatos, California Structural Steel Shaping a Master-Planned Class-A Office Campus in Silicon Valley Albright Campus is a group of four Class-A office buildings with four more buildings to come. This is a mixed-use, master planned community. This state-of-the-art development is situated on a 22-acre
222 Main Office Building
222 MAIN OFFICE BUILDING Salt Lake City, UT Constructing a Seismically Advanced High-Rise Within a Zero-Access Urban Footprint The 222 Main Office Building was awarded the 2010 Gold Best of Awards Outstanding Office Project by Mountain States Construction magazine. This twenty-two story building required 4,500 tons of