Zions Bank

Provo, Utah

Executing a Seismically Resilient Financial Center on a Constrained Urban Site

Zions Bank Financial Center is a structure with varying tower heights advancing to nine stories at its highest point. This project required tight scheduling to accommodate erection between two existing buildings and no lay-down space. The structure extends over the drive-through area utilizing 235 ft of structural steel creating a porte-cochère. Rolled tube steel and channel were incorporated to compose the entrance canopy and 96 CoreBrace™ buckling restrained braces (BRB’s) were incorporated due to the high seismic region. Through SME expertise, this project was completed two months ahead of schedule.

Project Details

04/14/2010

1,100 tons of steel

CLIENT

Zions Bank

CONTRACTOR

Camco Construction

ARCHITECT

Elliott Workgroup

STRUCTURAL ENGINEER

Dunn Associates, Inc.

Project Gallery

Front view of a bank
Steel building under construction
Steel beam building under construction
Steel building under construction
outside of a Zions bank
Steel beam building under construction
Steel beam building under construction

Related Projects

2026-03-16T13:45:17-06:00

Wallis Annenberg Center

Wallis Annenberg Center Beverly Hills, California Blending Historic Preservation and Contemporary Performance Architecture Through Structural Steel Building the Wallis Annenberg Center for the Performing Arts in the heart of Beverly Hills involved the creation of a new cultural facility that both preserves and adapts the landmark 1933

2026-03-16T13:45:38-06:00

Zions Bank

Zions Bank Provo, Utah Executing a Seismically Resilient Financial Center on a Constrained Urban Site Zions Bank Financial Center is a structure with varying tower heights advancing to nine stories at its highest point. This project required tight scheduling to accommodate erection between two existing buildings and

2026-03-16T13:47:22-06:00

Horton Plaza

Horton Plaza San Diego, California Transforming a Retail Landmark into a Next-Generation Urban Tech Campus Redevelopment of Horton Plaza from shopping mall to office/tech campus is multi-phase project with the first phase of demolition of the exterior façade. The future Campus at Horton will include 700,000 square

2026-03-16T13:49:33-06:00

Dendreon Pharmaceuticals

Dendreon Pharmaceuticals Seal Beach, California Structural Steel Supporting Precision Pharmaceutical Production Dendreon Pharmaceuticals is a state-of-the-art facility dedicated to biopharmaceuticals and the development of immunotherapy for cancer treatments utilizing the patient’s own immune cells. Building Systems include clean rooms, manufacturing practices space, laboratories, administrative space, warehousing, modular

2026-03-16T13:50:49-06:00

Albright Campus

Albright Campus Los Gatos, California Structural Steel Shaping a Master-Planned Class-A Office Campus in Silicon Valley Albright Campus is a group of four Class-A office buildings with four more buildings to come. This is a mixed-use, master planned community. This state-of-the-art development is situated on a 22-acre