Moscone Center Expansion
San Francisco, California
Delivering a Phased, Below-Grade Expansion While Keeping a Convention Center Fully Operational
The Moscone Center Expansion project is an extraordinary effort by the City of San Francisco and the entire design and construction team. SME played a vital role in a concentrated 16 month design assist effort with the Owner, General Contractor, and Design Team which included the very same team we are proposing for Google Charleston East. This unique structure was designed in two distinct phases in order to keep half the convention center fully functioning throughout the duration of construction.
For the overall project, almost half of the work will be completed underground, allowing for optimum connection between existing and new construction of the two phases. This expansion creates an additional 305,000 SF, comprising exhibition space, new meeting rooms, pre-function space, new ballroom space, and support areas that allow Moscone Center to be nationally competitive in the convention space marketplace. Due to the extraordinary expertise of the SME Steel Preconstruction Team, this project has already exceeded early expectations.
Project Details
01/03/2019
7,900 tons of steel
CLIENT
SF Department of Public Works
CONTRACTOR
Webcor Builders
ARCHITECT
Mark Cavagnero Associates
STRUCTURAL ENGINEER
Skidmore, Owings & Merrill
Related Projects
Salt Palace Convention Center
Salt Palace Convention Center Salt Lake City, Utah Long-Span AESS Trusses and Sculptural Steel Defining a Landmark Convention Hall The Salt Palace Convention Center was skillfully erected utilizing two cranes simultaneously. Flawless AESS banana trusses support the unique roof structure of the perimeter while 260 ft triangulated
Wallis Annenberg Center
Wallis Annenberg Center Beverly Hills, California Blending Historic Preservation and Contemporary Performance Architecture Through Structural Steel Building the Wallis Annenberg Center for the Performing Arts in the heart of Beverly Hills involved the creation of a new cultural facility that both preserves and adapts the landmark 1933
Zions Bank
Zions Bank Provo, Utah Executing a Seismically Resilient Financial Center on a Constrained Urban Site Zions Bank Financial Center is a structure with varying tower heights advancing to nine stories at its highest point. This project required tight scheduling to accommodate erection between two existing buildings and
Moscone Center Expansion
Moscone Center Expansion San Francisco, California Delivering a Phased, Below-Grade Expansion While Keeping a Convention Center Fully Operational The Moscone Center Expansion project is an extraordinary effort by the City of San Francisco and the entire design and construction team. SME played a vital role in a
Horton Plaza
Horton Plaza San Diego, California Transforming a Retail Landmark into a Next-Generation Urban Tech Campus Redevelopment of Horton Plaza from shopping mall to office/tech campus is multi-phase project with the first phase of demolition of the exterior façade. The future Campus at Horton will include 700,000 square
Dendreon Pharmaceuticals
Dendreon Pharmaceuticals Seal Beach, California Structural Steel Supporting Precision Pharmaceutical Production Dendreon Pharmaceuticals is a state-of-the-art facility dedicated to biopharmaceuticals and the development of immunotherapy for cancer treatments utilizing the patient’s own immune cells. Building Systems include clean rooms, manufacturing practices space, laboratories, administrative space, warehousing, modular
Albright Campus
Albright Campus Los Gatos, California Structural Steel Shaping a Master-Planned Class-A Office Campus in Silicon Valley Albright Campus is a group of four Class-A office buildings with four more buildings to come. This is a mixed-use, master planned community. This state-of-the-art development is situated on a 22-acre
222 Main Office Building
222 MAIN OFFICE BUILDING Salt Lake City, UT Constructing a Seismically Advanced High-Rise Within a Zero-Access Urban Footprint The 222 Main Office Building was awarded the 2010 Gold Best of Awards Outstanding Office Project by Mountain States Construction magazine. This twenty-two story building required 4,500 tons of