“SME Steel Contractors’ field manager, Mark Mundy, held his breath and watched as the two cranes lifted the giant truss at a twisted angle above the roof line. Project ironworkers gently guided the 260-foot truss into alignment, as the cranes lowered it into place between a 120-ft-long king truss on one end and slots in pre-cast walls of the multi-use domed sports auditorium on the other. Mundy let out a big sigh of relief. “
Comments will be approved before showing up.