San Francisco Public Utilities Commission HQ

San Francisco, California

BIM-Coordinated Structural Steel Fabrication and Erection

The San Francisco Public Utilities Commission Headquarters is a LEED Platinum design comprised of a 14-story concrete structure with four stories of structural steel topping off the building. The unique highlight of this building is the 12-story structural steel wind turbine tower attached to the north side exterior of the structure helping to create the greenest urban building in the United States. The biggest challenge on this project was constructing in a densely populated area with no lay down space. Steel was delivered and erected directly from the trucks to the roof. Completion of the structural design was accomplished through an integrated project delivery method which incorporated weekly BIM coordination meetings between the structural steel and exterior curtain wall systems as well as collaboration between design team members.

Project Details

04/10/2012

300 tons of steel

CLIENT

San Francisco Public Utilities Commission

CONTRACTOR

Webcor Builders

ARCHITECT

Kaplan McLaughlin Diaz

ENGINEER OF RECORD

SOHA Engineers

LEED

Platinum

Project Gallery

San Francisco Public Utilities Commission HQ
San Francisco Public Utilities Commission HQ
San Francisco Public Utilities Commission HQ under construction, steel frames with CoreBrace BRB's
San Francisco Public Utilities Commission HQ stairways

Related Projects

2026-03-16T13:46:14-06:00

San Francisco International Airport T3

San Francisco International Airport T3 San Francisco, California SME Steel Fabrication and Erection for an Active Airport Terminal San Francisco International Airport Terminal 3 project includes the complete transformation of the checkpoint areas and main concourse, which serves United Airlines. This 400,000 SF design-build project includes the

2026-03-16T14:24:36-06:00

Boise Airport

Boise Airport Boise, Idaho Signature Curvilinear Structural Steel by SME Steel Boise Airport, the busiest airport in Idaho, serves more passengers than all other Idaho airports combined including 10 times more than the second busiest. In addition to providing commercial and general aviation services, Boise Airport functions

2026-03-16T14:32:37-06:00

San Francisco Public Utilities Commission HQ

San Francisco Public Utilities Commission HQ San Francisco, California BIM-Coordinated Structural Steel Fabrication and Erection The San Francisco Public Utilities Commission Headquarters is a LEED Platinum design comprised of a 14-story concrete structure with four stories of structural steel topping off the building. The unique highlight of