“The Colosseum had a demanding schedule, 10 months from the start of design until topping out. During the bid process, the owner required the bid to include a design team from the fabricator/erector. SME Steel was selected as the steel fabricator, and provided more than 5000 tons of steel for the project. 7800 erectable pieces of steel had to be designed, detailed, fabricated, and erected within the 10-month period.”
Comments will be approved before showing up.