Fast Flying Steel

November 1st, 2009|Magazine Articles|

Fast Flying Steel Southwest Contractor, November 2009 "Las Vegas Airport Terminal 3 Tops Out Steel Six Weeks Early" "McCarran International Airport’s expansion includes Terminal 3, a 1.9-million-sq-ft building with a frame 300 ft wide and a half mile long. Other current airport construction includes the recently completed runway reconstruction and several new roadways, a [...]