Caesar’s Colosseum

October 1st, 2003|Magazine Articles|

Caesar's Colosseum Modern Steel Construction, October 2003 "Steel Wins Big" "The Colosseum had a demanding schedule, 10 months from the start of design until topping out. During the bid process, the owner required the bid to include a design team from the fabricator/erector. SME Steel was selected as the steel fabricator, and provided more [...]